quoted by بیان شده - ذکر شده - گفته شده توسط 💠 Where satisfactory machine alignment is achieved above, but subsequently is changed, for
example, due to incorrectly installed or modified pipework, the CONTRACTOR shall repeat the
... [مشاهده متن کامل]
machine alignment to bring it back to a satisfactory condition. The original Test Sheet will be
rejected and replaced by the new sheets witnessed and signed by the COMPANY Engineer.
The following guidelines should be used for the procedure and tolerances whilst making an
alignment, if not quoted by the equipment MANUFACTURER.